This Stainless Steel Industrial Mixing Tank is specially designed for the production of liquid products such as laundry detergent, shampoo, shower gel, liquid soap, and other viscous materials. It integrates heating, stirring, homogenizing, temperature control, and cooling functions into one complete system, ensuring efficient and uniform mixing results.
| Model | Working Volume (L) | Blending Power (KW) | Blending Speed (r/min) | Homogenizing Power (KW) | Homogenizing Rotation Speed (r/min) | Heating Method |
|---|---|---|---|---|---|---|
| ACE-200 | 200 | 1.5 | 0-63 | 4.0 | 0-3200 | Steam Heating Or Electric Heating |
| ACE-500 | 500 | 3.0 | 0-63 | 7.5 | 0-3200 | |
| ACE-1000 | 1000 | 4.0 | 0-63 | 11 | 0-3200 | |
| ACE-1500 | 1500 | 5.5 | 0-63 | 11-15 | 0-3200 | |
| ACE-2000 | 2000 | 7.5 | 0-63 | 15-18.5 | 0-3200 | |
| ACE-3000 | 3000 | 7.5-11 | 0-63 | 18.5-22 | 0-3200 | |
| ACE-5000 | 5000 | 11-15 | 0-63 | 22-30 | 0-3200 |
The machine is suitable for mixing and dissolving different materials evenly, making it an ideal solution for cosmetic, chemical, and daily chemical production lines.
The machine uses a combination of mechanical stirring and high-shear homogenization to evenly mix different raw materials. The heating system raises the temperature to accelerate dissolution, while the cooling system maintains product stability. The homogenizer refines particles, ensuring smooth and uniform finished products.
We are experienced in the whole packing and shipping process, and we will be responsible for any damage made during shipping and send clients replacements for free.
Q1 What is your terms of packing?
Generally, we pack our goods in plywood case or carton package for small parts. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2 What is your terms of payment?
T/T in advance, 30% as deposit, and finish 70% balance payment before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3 What is your terms of delivery?
EXW, FOB, CIF, DDU.
Q4 How about your delivery time?
Generally, it will take 3 to 4 weeks after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5 Can you produce according to the samples?
Yes, we can produce by your samples or technical drawings.
Q6 Do you test all your goods before delivery?
Yes, we have 100% test before delivery to ensure quality standards.